Finding out that an accessory dwelling unit was built without permits can be stressful. Maybe you purchased a Sacramento property with a converted garage, backyard cottage, basement apartment, or detached structure that was already being used as living space. Maybe a family member completed the work years ago and nobody is sure which permits were obtained. Now you want to rent the unit, sell the property, refinance, insure it, or simply make sure it is safe.
The good news is that an unpermitted ADU does not always have to be demolished. California created a clearer path for certain older ADUs and junior accessory dwelling units, commonly called JADUs, to become legal. However, legalization is not automatic. The structure still needs to satisfy minimum health and safety requirements, and the correct local agency must review the application.
Geco Construction Inc. helps Sacramento homeowners understand the construction side of this process. The first goal is to determine what exists, what condition it is in, what documents may be required, and whether corrections are likely before a permit application is submitted.
What Is an Unpermitted ADU
An unpermitted ADU is a separate living space that was built or converted without all required approvals. It may have a kitchen, bathroom, sleeping area, and private entrance, but the city or county records do not show it as an approved dwelling unit.
Common examples include:
A garage converted into an apartment without permits
A backyard building changed into living space
A basement or addition with a kitchen and bathroom
A detached unit built without approved plans or inspections
A permitted structure that was later expanded or altered without approval
Not every unpermitted room qualifies as an ADU. The space must be evaluated based on its layout, construction date, condition, property records, and the rules that apply to the property. That is why Geco Construction Inc. recommends starting with research and a physical assessment rather than assuming the unit can simply be added to the property records.
Why Legalizing the ADU Matters
An unpermitted unit can create problems when a homeowner sells, refinances, changes insurance, applies for another permit, or responds to a code complaint. It can also expose the homeowner and occupants to safety concerns involving electrical wiring, plumbing, structural work, heating, ventilation, fire access, or emergency exits.
Legalization helps create a documented path toward a safer and more usable space. After the required work, inspections, and final approval are completed, the homeowner has better documentation showing that the unit was reviewed for residential use.
How California Law Helps Certain Older ADUs
Assembly Bill 2533 changed California law beginning January 1, 2025. The law created protections for certain unpermitted ADUs and JADUs constructed before January 1, 2020.
For a qualifying older unit, a local agency generally cannot deny the permit only because the structure violates current building standards, does not comply with current ADU law, or conflicts with a local ADU ordinance. The local agency can still require corrections when necessary to protect occupants or the public, and it may deny approval when the structure is considered substandard under applicable health and safety standards.
This difference is important. The law is not a free pass for unsafe construction. It creates a route to evaluate and correct an older unit without automatically treating every difference from today's rules as a reason for denial.
The Construction Date Is Important
The special AB 2533 path applies to qualifying ADUs or JADUs constructed before January 1, 2020. Homeowners may need information that helps establish when the unit was built or converted. Property records, old listings, dated photographs, utility records, leases, receipts, previous plans, and other documents may be useful depending on what the permitting agency accepts.
Sacramento Has Two Review Options
For properties inside the City of Sacramento, the city's 2026 checklist describes two options for a previously unpermitted ADU or JADU.
Option 1 Standard Formal Review
The homeowner applies for a permit and submits plans showing compliance with the current California Residential Code. This is the traditional permitting route. It may be appropriate when the structure is newer, already close to current standards, or being substantially remodeled.
Option 2 AB 2533 Health and Safety Review
The homeowner applies using the standards connected to Health and Safety Code Section 17920.3. The application includes a completed substandard-housing checklist and plans showing the required health and safety information.
The city may still require a site plan, property boundaries, nearby streets or fire access, unit locations, separation distances, plumbing details, foundation information, room dimensions, framing information, and other construction details. Choosing this path does not eliminate the need for plans, inspections, or correction work.
Properties outside city limits may fall under Sacramento County or another local jurisdiction. The correct agency depends on the property address, not simply the word Sacramento in the mailing address. Requirements and submittal procedures can differ, so confirming jurisdiction should be one of the first steps.
Steps to Legalize an Unpermitted ADU in Sacramento
Confirm the Property Jurisdiction and Permit History
Start by determining whether the property is governed by the City of Sacramento, unincorporated Sacramento County, or another city. Request available permit records and compare them with the structures and improvements currently on the property.
Document the Existing Unit
Record the unit's approximate size, room arrangement, entrances, windows, plumbing fixtures, electrical panel, heating system, foundation, and connection to the main property. Do not conceal conditions or begin covering walls before the scope is understood.
Consider a Confidential Third Party Inspection
Before submitting the permit application, California law allows the homeowner to obtain a confidential third-party code inspection from a licensed contractor. The purpose is to understand the unit's current condition and the possible improvement scope before formally entering the permit process.
This can help identify obvious safety problems, establish priorities, and reduce surprises. It is not the same as city approval, and the permitting agency may identify additional requirements during plan review or inspection.
Prepare Plans and a Correction Scope
The plans should accurately show what exists and what will be corrected. Depending on the unit, the project may require architectural drawings, structural details, electrical information, plumbing and sewer information, mechanical details, energy documentation, and a site plan.
Submit the Permit Application
Once the documents are ready, the application is submitted to the appropriate building department. The agency reviews the plans and may issue corrections or request additional information. Responding completely and keeping documents organized can prevent avoidable delays.
Complete Corrections and Inspections
After permit issuance, the required construction work can begin. Inspections may occur at different stages, especially when walls must be opened to examine framing, wiring, plumbing, insulation, or connections. The project is not complete simply because the repair work looks finished. Final inspection and permit closure are essential.
Common Health and Safety Problems
Every unit is different, but legalization reviews often focus on a few major areas.
Structural and Foundation Conditions
Foundations, framing, roofs, and wall systems may need repairs or documentation showing they can safely support the existing structure.
Electrical Plumbing and Mechanical Work
Unsafe wiring, overloaded circuits, improper panels, plumbing leaks, unapproved connections, missing ventilation, or unsafe heaters may require correction. Work hidden behind finished walls may need to be exposed so it can be inspected.
Basic Living Requirements
Reviewers may check plumbing fixtures, hot water, heating, lighting, ventilation, room dimensions, moisture, sanitation, and sewage disposal.
Fire and Emergency Safety
Safe exits, emergency escape openings, smoke and carbon-monoxide alarms, fire separation, address visibility, and fire-apparatus access may affect approval. The exact requirements depend on the building and site.
Geco Construction Inc. can help homeowners separate cosmetic updates from the work necessary for safety and permit approval. New flooring and cabinets may improve appearance, but they do not correct an unsafe electrical system or inadequate foundation.
How Much Does ADU Legalization Cost
There is no reliable flat price because legalization is based on existing conditions. One unit may need plans, minor corrections, and inspections. Another may require structural reinforcement, a new electrical panel, plumbing replacement, sewer work, windows, ventilation, insulation, or substantial reconstruction.
Mistakes to Avoid
Assuming the unit is automatically approved because it is old
Continuing major remodeling before checking permit history
Hiding unsafe conditions behind new finishes
Using incomplete drawings that do not match the structure
Hiring separate trades without one coordinated scope
Budgeting only for visible improvements
Renting or advertising the unit without understanding local requirements
Treating online advice as a substitute for property-specific review
Frequently Asked Questions
Will Sacramento Make Me Tear Down an Unpermitted ADU
Not necessarily. A qualifying ADU built before January 1, 2020 may have a path under AB 2533. However, unsafe or substandard conditions may require substantial corrections, and approval depends on the property and agency findings.
Can I Legalize an Unpermitted Garage Conversion
Possibly. The garage must be evaluated as a dwelling, including its foundation, framing, ceiling height, exits, plumbing, electrical work, heating, ventilation, and other safety conditions. A garage conversion is not legal merely because someone has lived there for years.
Can Geco Construction Inc. Help With the Entire Process
Geco Construction Inc. can help evaluate the construction, develop a realistic improvement scope, coordinate with the appropriate design professionals, complete approved corrections, and prepare for inspections. The local agency makes the final permitting decisions.
Start With the Condition of the Existing Unit
The safest way to approach an unpermitted ADU is to learn what you have before deciding what to spend. Confirm the jurisdiction, review the permit history, document the unit, identify health and safety concerns, and build a correction plan based on the actual property.
Geco Construction Inc. helps Sacramento homeowners move from uncertainty toward a clearer construction plan. If you have an older garage conversion, backyard unit, or undocumented living space, contact Geco Construction Inc. to discuss the next step.